Case Study: Tier-1 Supplier Strengthens APQP Compliance
How a Tier-1 automotive supplier upgraded processes, reduced risk, and aligned with OEM APQP requirements.
INDUSTRY: Automotive Manufacturing
SERVICES: Assessment. Production. Operations. Staffing. Engineering and Maintenance. Quality.
Situation.
A tier one automotive supplier was shutting down their customer due to low JPH (Jobs per Hour) performance caused by downtime, scrap-rework, and performance efficiency. Seraph’s assessment uncovered specific areas to target to improve JPH and reduce customer downtime at the JIS (Just in Sequence) plant.
Actions.
3 key work packages:
WORK PACKAGE 1
Recovery Management
Objective:
Improve production output to required RPH 45 to appropriate targeted headcount.
Deliverables:
- Managed the turnaround project to a sustainable operating cadence.
- Supported plant manager and local leadership team.
- Evaluated organization, executed structural recommendations and competency evaluations.
WORK PACKAGE 2
Production Readiness
Objective:
Reduced downtime occurring at the customer by increasing JPH and performance efficiency.
Deliverables:
- Trained frontline leadership.
- Increased production to requirement while delivering desired quality.
- Deployed daily management system to drive increase in JPH from 27 to 45.
WORK PACKAGE 3
Engineering / Maintenance and Quality
Objective:
Established an efficient equipment maintenance and contingency system, minimized downtime, reduced scrap and first pass yield to target levels.
Deliverables:
- Developed contingency plans for all assembly processes.
- Developed a review process to improve PM (Preventative Maintenance) activities.
- Reduced rework and scrap.
- Developed a robust process for spare parts management.
Key Improvements.
- Identified and supported improvements in management shortcomings, gaps and competency issues.
- Defined KPIs that drove operations toward the JPH and quality targets, making these visible on the floor and reviewed daily in tiered meetings.
- Reduced headcount by identifying ways to reduce over budget resources, while defining needed RTR (Required To Run) to reach required JPH of 45 and then 52.
- Revised work instructions to reflect best methods to achieve targeted JPH.
- Transitioned subassemblies away from building to sequenced call-offs, to building to a managed buffer feeding the main production line.
- Updated and implemented standard escalation process related to a JIS operation.
- Contingency playbook created which included an implementation project action plan and timeline for each station and process.
- Used machine data to create paretos to identify top issues causing scrap and rework to drive permanent improvements for elimination of top issues.

Results.

- Seraph reduced target line headcount by 3.8% and overall headcount by 6.2%.
- JPH increased by 44.4%, maximum JPH per hour increased by 43.9%*.
- *JPH numbers were not higher due to limited number of call offs.
- Plant downtime decreased by 63%.
- Customer average vehicles lost decreased by 100% when comparing the 4 weeks before Seraph’s arrival to the last 4 weeks of the project.